Back to the good stuff. Here's the plumbing for the powder room on the first floor. The rough in is complete and inspected -- signed off on by the plumbing inspector.
Wednesday, November 18, 2009
Mechanicals..
It's all about the mechanicals this week -- plumbing, septic, electric, gas...lots of fun stuff but not lots of worthy photos...We're moving right along -- we got the septic system in under the wire and the boiler got fired up for the first time today! Here you see the electric panel with the outgoing sewer pipe...we ran into a small snag with the septic -- it turns out that it is 5 inches higher than the sewage pipe that leaves the house -- oops. So, no big deal, right? WRONG....we have to install a double pump with a 100 gallon storage tank to pump the sewage out of the house and up into the septic tank...which is a gravity tank.... ($4000) which we didn't plan for...ouch. So instead of going on vacation, for the next three years, we'll go into the basement and look at the pump. Sure beats the BVI. When we have this pump installed we'll be sure to post some photos. (Family if you are reading this, you'll understand why there will be no Christmas presents this year...instead you'll be welcome to use our toilets anytime...)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment